
Hazel Dell Christian Church
arcDESIGN was selected to design the new $4 million Children’s Ministry area. This 23,000 sf space was designed and built, with Pepper Construction, to reflect the culture of this growing congregation. From the large play area with custom-designed “mountains” to the smaller details such as retro-style booths in the diner-themed fifth and sixth grade area, this addition is truly designed to reach out to the children and parents in hopes of bringing them to closer to Christ. The flexibility and practicality of this design has helped Hazel Dell increase their attendance by nearly 20% within a year. This project was completed in May 2011, on time and within budget.